Aya Gold & Silver Reports High-Grade Exploration Drill Results at Boumadine
Aya Gold & Silver Reports High-Grade Drill Results at Boumadine

MONTREAL, May 20, 2026 (GLOBE NEWSWIRE) — Aya Gold & Silver Inc. (TSX: AYA; NASDAQ: AYA) (“Aya” or the “Corporation”) is pleased to report new drill results at the Boumadine Project (“Boumadine” or the “Project”) from its ongoing infill drill program in the Kingdom of Morocco. These results confirm strong high-grade continuity along the Boumadine Main Trend and support the potential for continued resource growth and scale.

Highlights

Boumadine Main Trend (5.4km) shows multiple additional high-grade intercepts:

  • BOU-DD25-745 intercepted 890 grams per tonne (“g/t”) silver equivalent (“AgEq”) over 51.5 metres (“m”) (2.05 g/t gold (“Au”), 535 g/t silver (“Ag”), 3.8% zinc (“Zn”), and 5.9% lead (“Pb”)), including 1,504 g/t AgEq over 19.3m (2.17 g/t Au, 1,032 g/t Ag, 5.3% Zn, and 9.8% Pb).
  • BOU-DD25-746 intercepted 665 g/t AgEq over 20.4m (1.63 g/t Au, 410 g/t Ag, 2.8% Zn and 3.4% Pb), including 1,276 g/t AgEq over 5.3m (3.98 g/t Au, 695g/t Ag, 6.1% Zn and 7.2% Pb) and 741 g/t AgEq over 14.5m (5.24 g/t Au, 204 g/t Ag, 3.9% Zn and 2.2% Pb), including 1,112 g/t AgEq over 8.4m (8.79 g/t Au, 276g/t Ag, 4.5% Zn and 2.3% Pb).
  • BOU-DD26-790 intercepted 746 g/t AgEq over 14.9m (0.62 g/t Au, 586 g/t Ag, 1.9% Zn and 3.7% Pb) including 1,227 g/t AgEq over 6.5m (1.05 g/t Au, 971g/t Ag, 1.9% Zn and 3.7% Pb).
  • BOU-DD26-786 intercepted 511 g/t AgEq over 9.4m (0.61 g/t Au, 399 g/t Ag, 1.4% Zn, and 1.0% Pb) including 1,928 g/t AgEq over 1.8m (1.54 g/t Au, 1,708g/t Ag, 2.5% Zn and 1.7% Pb).
  • BOU-DD26-792 intercepted 462 g/t AgEq over 8.1m (0.79 g/t Au, 237 g/t Ag, 3.0% Zn and 4.5% Pb) including 1,036 g/t AgEq over 2.2m (1.50 g/t Au, 563g/t Ag, 5.2% Zn and 10.4% Pb).

Exploration Update

69,209m drilled at Boumadine year-to-date. 20% of the planned 360,000m infill drilling program for 2026-2027 completed.

Wide Pickt banner — collaborative shopping lists app for Telegram, phone mockup with grocery list

“These latest results continue to demonstrate the exceptional grade, width and scale potential emerging at Boumadine,” said Benoit La Salle, President & CEO. “Intercepts including 890 g/t AgEq over 51.5m in BOU-DD25-745 — our strongest drill intercept to date at Boumadine on a grade-thickness basis — located just 70m below the current pit shell, highlights the strong continuity of wide, high-grade mineralization along the 5.4-kilometre Boumadine Main Trend, which remains open in all directions. With over 69,000m drilled year-to-date and 11 rigs currently active, we are aggressively advancing the 2026–2027 infill and expansion program ahead of the updated PEA expected mid-year.”

Pickt after-article banner — collaborative shopping lists app with family illustration

Table 1 – Significant Intercepts from Boumadine Drill Exploration Program (Core Lengths)

DDH No.From (m)To (m)Au (g/t)Ag (g/t)Length* (m)Cu (%)Pb (%)Zn (%)Mo (g/t)Ag Eq** (g/t)
BOU-DD25-745214.5266.02.0553551.50.05.93.830890
Including244.1263.42.171,03219.30.19.85.3211,504
BOU-DD25-74679.098.82.1677119.80.01.43.1281,345
Including83.385.210.926011.90.01.23.4371,024
BOU-DD25-746107.0121.55.2420414.50.02.23.932741
Including113.1121.58.792768.40.02.34.5271,112
BOU-DD25-746293.0313.41.6341020.40.13.42.834665
Including298.0303.01.584845.00.15.73.6111,156
Including306.8312.13.986955.30.17.26.1281,276
BOU-DD25-754348.8355.80.401507.00.01.02.173425
BOU-DD26-759255266.00.42216110.11.31.921317
Including255.0258.11.165523.10.01.82.943739
BOU-DD26-759336.4342.60.583026.20.01.63.823461
Including336.4339.90.804473.50.02.15.023657
BOU-DD26-766193.4198.20.891674.80.00.827293
BOU-DD26-767273.92810.38857.101.23.768215
BOU-DD26-767373.2381.50.721918.3021.922328
Including374.2376.90.884672.70.05.12.761700
BOU-DD26-773253.0255.61.185162.60.02.32.848712
BOU-DD26-775323.5335.50.4417212.00.01.02.034272
Including324.4326.21.766621.80.02.64.71,032966
BOU-DD26-775338.1346.30.761848.20.01.51.71,819338
Including338.9341.41.444282.50.03.83.92,736737
BOU-DD26-775400.0409.50.762169.50.02.74.6507429
Including401.4407.40.942696.00.03.65.6639534
BOU-DD26-777501.2513.00.539411.80.01.33.031226
BOU-DD26-782184.4186.31.924781.90.22.46.674820
BOU-DD26-783274.0289.81.1019815.80.12.22.61,222405
Including283.8287.81.754194.00.24.74.53,202805
BOU-DD26-786403.2412.60.613999.40.01.01.492511
Including403.2405.01.541,7081.80.01.72.5691,928
BOU-DD26-786459.2462.81.381953.60.15.13.593481
Including459.2461.02.383551.80.19.95.0127845
BOU-DD26-790140.5155.40.6258614.90.03.71.9127746
Including148.3154.81.059716.50.06.72.11611,227
BOU-DD26-792297.0305.10.792378.10.04.53.083462
Including300.9303.11.505632.20.010.45.22,8911,036
BOU-DD26-796368.4373.10.632314.70.03.02.357387
BOU-DD26-796378.0384.10.201176.10.12.62.402236
BOU-DD26-799271.5276.41.052104.90.32.64.560452