Premier American Uranium Expands Kaycee Project with 2026 Drill Results
Premier American Uranium Kaycee Project 2026 Drill Results

Premier American Uranium Inc. (PUR) has announced preliminary results from its 2026 exploration drilling program at the Kaycee Project in Wyoming's Powder River Basin. Drilling began at the Outpost target in May 2026, with 19 holes completed totaling 17,100 feet. A total of 100,000 feet of drilling is planned for the season, focusing on Outpost, Rustler, and Stampede areas.

Drilling Highlights

Infill and step-out drilling at Outpost has expanded and further defined the uranium mineralization zone. Seven of the 19 holes intersected uranium mineralization at grades of 0.02% eU₃O₈ or higher. Drilling has identified two target sand units within the lower Wasatch Formation, which hosts uranium mineralization in the nearby Pumpkin Buttes district.

Technical Advancements

The company completed a project-wide drillhole collar and elevation survey to support future mineral resource estimation and technical evaluation.

Wide Pickt banner — collaborative shopping lists app for Telegram, phone mockup with grocery list

Colin Healey, CEO of PUR, stated: "These initial results highlight the exploration potential of the Kaycee Project. The expansion of mineralization at Outpost and geological insights are improving our understanding of mineralization controls. We are pleased with progress and look forward to advancing drilling at Outpost and testing Rustler and Stampede targets."

Pickt after-article banner — collaborative shopping lists app with family illustration